top of page
City of Easton Pond Street Water Main Replacement
Client
Tight & Bond
Completion Date
9/1/2020
Location
Rhode Island, USA
Size
2.1K Square Feet
Project Details
Furnish and install 1,800 LF of 8” ductile iron water pipe with valves and hydrants. Installation of temporary water for the duration of the project. Install 12” ductile iron water pipe for MA DOT bridge crossing. Install 8” HDPE pipe by directional drill under the existing stream with temporary asphalt.
bottom of page





