top of page
DIG.240731.Sites.Site2.Large-11.jpg

Our Portfolio

Browse through some of our featured projects below to review the scope of our projects, which include highway and road construction, excavation for utilities, public municipality construction projects and private company construction and demolition projects on Cape Cod and beyond. Contact us to discuss your project needs!

Heavy Highway, Road Construction & Utilities

image.png

City of Hingham Bulow Road Water Main Replacement

Date: 12/1/2020

Contact: Weir River Water System OPM City of Hingham

Engineer: Environmental Partners

Description: Furnish and install 2,000 LF of 8” ductile iron water pipe with all valves and hydrants. Furnish and install 900 LF of 6” ductile iron water pipe with all valves and hydrants

E382E3DD-5D8F-4111-93E8-2C6D488199B0_JPG.jpg.jpeg

Town of Eastham New Watermain Contracts 13, 14, 15, 16, 18, 19, 20, 21, 22 & 23.

Date: 2/1/2019 – On-going

​Engineer: Environmental Partners

​Description: Furnish and install 375,000 LF of new 6”, 8” and 12" ductile iron water pipe for the new municipal water system. Installation of 2,000 residential services. Temporary asphalt trench paving.  Full-width milling and overlay asphalt paving. Multiple 6” and 8” HDPE directional drills.

carver-police-station.jpg.jpeg

City of Easton Pond Street Water Main Replacement

Date: 9/1/2020

Engineer: Tight & Bond

Description: Furnish and install 1,800 LF of 8” ductile iron water pipe with valves and hydrants. Installation of temporary water for the duration of the project. Install 12” ductile iron water pipe for MA DOT bridge crossing. Install 8” HDPE pipe by directional drill under the existing stream with temporary asphalt.

sandwich-pleasant-wood.avif

Town of Sandwich Pleasant Wood Drainage

Date: 2019-2020

Description: Installation of road drainage, multiple town sites.

​​

​​

​

​

​

​

​

Public Municipalities

B323A465-2676-4835-AACE-3C95685CD4C7_JPG.jpg

Carver Police Station

Date: 2/1/2020
General Contractor: Tower Construction Corporation
Engineer: OPM Daedalus
Description: Complete site package for new Police station. Clear and stump 4 acres, 6,000 cubic yards of cuts and fills for topography grade. Installation of site grading, drainage, prep for site lighting, and utilities. Install water, sewer, sidewalks, and asphalt paving.

sandwich-public-safety.jpg

Sandwich Public Safety Facility & Fire Station #2

Date: 6/1/19
General Contractor: Boston Building and Bridge
Engineer: GGD
Description: Complete site package for new 38,000 SF Police and Fire station. Installation of site grading, drainage, sewer, water, prep for site lighting and utilities, sidewalks, and asphalt paving.

hyannis-fire-station.jpg

Hyannis Fire Station

Date: 2018-2020
General Contractor: CTA Construction Management
Description: Demolition and removal of an existing facility. Complete site package for new 75,000 SF Fire station. Installation of site drainage with a retention pond, sewer connection, prep for site lighting and utilities, curbing, sidewalks, and asphalt paving.

tisbury-fire-station.jpg

Tisbury Fire Station

Date: 2017
General Contractor: J.K Scanlan/Dellbrook
Description: Demolition and removal of an existing facility. Complete site package for new 21,000 SF Fire Station. Installation of drainage, water, sewer, prep for utilities and site lighting, curbing, and asphalt paving.

oak-bluffs-fire-station.jpg

Oak Bluffs Fire Station

Date: 2015

General Contractor: J.K. Scanlan

Description: Demolition and removal of an existing facility. Complete site package for new Fire Station. Installation of site drainage, water, prep for site lighting and utilities, curbing, and asphalt paving.

67623831-3934-45AF-BB78-2B32C4D8C79F_JPG.jpg

Town of Barnstable Dredging and Beach Nourishment

Date: 10/1/2018 – 12/20/2020

Engineer: Town of Barnstable

Description: Sampson’s Island Phase 2 & Phase 3. Dewatering and spreading 50,000 cubic yards of sand on Island. All equipment delivered by barge and loaded on to beach.

bourne-dredging.jpg

Town of Bourne Dredging

Date: 12/1/2021
Description: Excavate and load 24,000 CY of sand and stockpile on site.

carver-fire-station.jpg

Carver Fire Station

Date: 3/1/2016
General Contractor: M. O’Contracting Inc.
Contact: OPM Daedalus
Description: Complete site package for new 45,000 SF Fire station. Installation of site grading, drainage with a retention pond. Installation of water, sewer, curbing, prep for site lighting and utilities, sidewalks, and asphalt paving.

chatham-cemetery.jpg

Chatham Cemetery

Date: 3/1/2018
Engineer: JM O’Reilly 
Description:  Excavate and cut 40,000 cubic yards of material to achieve grade, removal of surplus material. Installation of new road, drainage, water main, final grade with loam and hydroseed.

orleans-police-station.jpg

Orleans Police Station

Date: 2017
General Contractor: RCA Builders
Description:  Demolition and removal of an existing facility. Complete site package for a new Police station. Installation of site drainage, septic, prep for site lighting and utilities, curbing, sidewalks, and asphalt paving.

brewster-drainage.jpg

Brewster Drainage

Date: 2016
Contact: Town of Brewster
Description: Fisherman landing. Demolition and removal of an existing parking lot. Reconstruction of a new parking lot. Installation of site drainage, new septic leaching field, curbing, and asphalt paving.

barnstable-water.jpg

Barnstable Water

Date: 2014 - 2016
Description:  Furnish and install approximately 12,000 ft of 8” & 12” ductile iron water main pipe at multiple town locations.

786B10EB-9A21-44F4-8BF5-869646272CC7_JPG.jpg

Oak Bluffs North Beach Nourishment

Date: 2/1/2020
Contact: Oak Bluffs Town Administrator
Engineer: Foth Engineering
Description: Dewatering, trucking, and spreading 40,000 CY of sand on the Island. Build Timber groins with 76 pilings driven 27’ into the ground. Worked through winter conditions on the island with all materials and equipment shipped barged. Reconstruction of existing stone jetty and dredging of harbor entrance.

Private Companies

IMG_0203.jpeg

Willowbend Riverside Town Homes

Date: 6/1/2019 – 1/1/2021
Engineer: Baxter & Nye Engineering    
Description: Complete site-packages for (11) new townhomes. Build precast block retaining wall 1,200’ x 30’ high to retain 14,000 CY of compacted fill. Installation of 1,200 LF of 12” ductile iron water pipe, 1,500 LF of 8” sewer main. Prep for site lighting and utilities, grading, curbing, asphalt paving.

polhem-web.jpg

Polhemus Savery DaSilva

Date: 2012-2017
Description: Provide all site services for the demolition of existing or new construction homes for high-end builders. Site, water, septic, sewer, grading, utility prep, etc. 

balise-motor.jpg

Balise Motor Companies Overflow Parking Lot

Date: 7/1/2020
Engineer: Baxter & Nye Engineering
Description: Demolition and removal of existing 20,000 SY buildings and parking areas. Installation of site drainage with a retention pond, prep for site lighting and utilities, install curbing and asphalt paving.

Construction company South Dennis

Dig It Construction LLC offers  site management, septic installation, roadwork, demolition, and marine work, serving both residential and commercial clients with expert, reliable solutions.

Contact

Fax

​508-342-7652

Address

​22 Diamonds Path
South Dennis, MA 02660

Quick Links

© 2025 by Dig It Construction LLC.

bottom of page